The Art · 100 Bowl Project

Bowl 6

100 Bowl Project


(Future TO note: This is all I have documented for this bowl. This is the very first note I took on the bowls to start documenting and planning on doing 100. Not even sure if I had set that goal yet. This really is the beginning of this project that would take me 2.5 years to complete and take me on a whole life adventure. It’s been amazing looking back on these notes.)

Notes from the first 6 bowls.


  • Bowls are going well
  • first 3 bowls done with the oak logs acquired by Mik are turning well
  • Sand paper is going quicker than expected.
    • the sawdust is clogging it up.
      • Not sure if its from moisture or sap
        • I assume moisture
          • then why is it sticking together
  • N64 white mask is fogging up my safety goggles.
    • ordered full face mask to solve issue
  • Used grinder to sharpen tools for first time. Worked well
    • will keep sharpening the cheap pair I got for this purpose until I get better to sharpen the expensive ones 
  • Backed up on the Grain Spawn
  • Issues with the sterilization process
    • Solution: Laminar Flow Hood and Proper Pressure Cooker
    • Needs to be moved to new spot- Bathroom is contaminated with Trick

Date: 3/1/23 3:29pm

Music: 

Moon Phase: 

Weather:

Synchronicities, weird shit, whatever: 

Tarot Card Draw:

Substances:

Notes: 

Idea Going In:

Idea Coming Out: 

New Ideas, Insights, Process Improvement:

Inquire About This Piece ← All Pieces
The Monthly Letter

Hear about new pieces first

Bowls are announced to the letter before anywhere else. One email a month, from the workshop.

No spam, no selling your address. Self-hosted, like everything else here.

Contact Watch Live